Table of ContentsPLANNING OF WORKER MEMBER WITH JET WASHOUT
A. Bondarenko, Candidate of Technical Sciences (Ph.D.), Associate Professor of Department of mining machines and engineering State higher educational Institution “National Mining University”, Dnepropetrovsk, Ukraine, e-mail: bondarenkoa@nmu.org.ua
Abstract. Description of innovative technical decision of worker member improvement is conducted. The increase of the sucked mash concentration at the decline of washing out water expense by introduction of new structural elements is attained. Intensification of process of soil extraction from the pit face, and also the economy of power resources is provided.
Keywords: shallow dredge, worker member, washout of soil.
|